	{"id":2414,"date":"2023-07-31T11:36:53","date_gmt":"2023-07-31T09:36:53","guid":{"rendered":"https:\/\/yaounde.cm\/?p=2414"},"modified":"2023-07-31T15:24:09","modified_gmt":"2023-07-31T13:24:09","slug":"%f0%9d%97%a3%f0%9d%97%a5%f0%9d%97%a2%f0%9d%97%9d%f0%9d%97%98%f0%9d%97%a7-%f0%9d%97%96%f0%9d%97%a2%f0%9d%97%a0%f0%9d%97%a3%f0%9d%97%9f%f0%9d%97%98%f0%9d%97%a0%f0%9d%97%98%f0%9d%97%a1%f0%9d%97%a7","status":"publish","type":"post","link":"https:\/\/yaounde.cm\/?p=2414","title":{"rendered":"\ud835\udde3\ud835\udde5\ud835\udde2\ud835\udddd\ud835\uddd8\ud835\udde7 \ud835\uddd6\ud835\udde2\ud835\udde0\ud835\udde3\ud835\udddf\ud835\uddd8\ud835\udde0\ud835\uddd8\ud835\udde1\ud835\udde7\ud835\uddd4\ud835\udddc\ud835\udde5\ud835\uddd8 \ud835\uddd7\u2019\ud835\uddd4\ud835\udde6\ud835\udde6\ud835\uddd4\ud835\udddc\ud835\udde1\ud835\udddc\ud835\udde6\ud835\udde6\ud835\uddd8\ud835\udde0\ud835\uddd8\ud835\udde1\ud835\udde7 \ud835\udde3\ud835\udddf\ud835\udde8\ud835\udde9\ud835\udddc\ud835\uddd4\ud835\udddf \ud835\uddd7\ud835\udde8\ud835\udde5\ud835\uddd4\ud835\uddd5\ud835\udddf\ud835\uddd8 \ud835\uddd7\ud835\uddd8 \ud835\udddf\ud835\uddd4 \ud835\udde9\ud835\udddc\ud835\udddf\ud835\udddf\ud835\uddd8 \ud835\uddd7\ud835\uddd8 \ud835\uddec\ud835\uddd4\ud835\udde2\ud835\udde8\ud835\udde1\ud835\uddd7\ud835\uddd8 (PCADY)"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\" id=\"h-contexte-du-projet\"><a>Contexte du projet<\/a><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"> Le projet compl\u00e9mentaire d\u2019assainissement pluvial durable de la Ville de Yaound\u00e9\u0301 (PCADY) s\u2019inscrit dans la continuit\u00e9\u0301 des objectifs vis\u00e9s par les phases 1 et 2 du Projet d\u2019assainissement de Yaound\u00e9\u0301 (PADY), tout en apportant les ajustements n\u00e9cessaires pour accroitre les r\u00e9sultats escompt\u00e9s. En effet, la construction de 17 km de canaux sur les cours d\u2019eau qui drainent la ville de Yaound\u00e9\u0301 lors de la premi\u00e8re et de la deuxi\u00e8me phase du Projet a contribu\u00e9\u0301 \u00e0 r\u00e9duire de mani\u00e8re significative la fr\u00e9quence et les effets des inondations dans une partie de la ville. Ce projet a contribu\u00e9\u0301 \u00e0 am\u00e9liorer l\u2019adaptation de la ville de Yaound\u00e9\u0301 au changement climatique. Cependant, des pluies exceptionnelles enregistr\u00e9es en 2018 et ayant &nbsp;provoqu\u00e9 de nouvelles inondations, ont permis d\u2019identifier des actions compl\u00e9mentaires \u00e0 la phase 1 et 2. C\u2019est ainsi qu\u2019une \u00e9tude r\u00e9alis\u00e9e dans la deuxi\u00e8me phase du projet a montr\u00e9\u0301 la n\u00e9cessit\u00e9\u0301 de r\u00e9aliser de nouveaux ouvrages afin de r\u00e9duire significativement la fr\u00e9quence des inondations dans la ville dans un contexte de changement climatique.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Aussi, certaines activit\u00e9s pertinentes du PADY 2 n&rsquo;ont pas pu \u00eatre r\u00e9alis\u00e9es \u00e0 cause des difficult\u00e9s dans le processus d\u2019acquisitions et aussi du fait de la Covid 19. Pour ne pas d\u00e9grader la performance du portefeuille avec un projet qui devenait vieux, la Banque a pr\u00e9f\u00e9r\u00e9 cl\u00f4turer la phase 2 au 30 juin 2021 et s&rsquo;est engag\u00e9e \u00e0 donner une r\u00e9ponse \u00e0 une nouvelle requ\u00eate du Gouvernement pour prendre en compte de nouvelles activit\u00e9s comme le traitement et la gestion des d\u00e9chets, le bassin d\u2019\u00e9cr\u00eatage des crues, l\u2019am\u00e9lioration des voies de circulation v\u00e9hiculaire et d\u2019entretien sur les berges des canaux d\u00e9j\u00e0 construites en vue de leur int\u00e9gration dans le r\u00e9seau de transport urbain et d\u2019adresser le probl\u00e8me de la pr\u00e9-collecte et de la valorisation des d\u00e9chets solides m\u00e9nagers qui constituent une contrainte s\u00e9rieuse au fonctionnement normal des canaux de drainage.  <\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-duree-d-execution\"><a>Dur\u00e9e d&rsquo;ex\u00e9cution<\/a><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<a>Le pr\u00e9sent projet sera ex\u00e9cut\u00e9 en 48 mois pour un co\u00fbt global de 30 millions d\u2019UC. La contribution de la Banque, \u00e0 travers un pr\u00eat FAD, est de 27 millions d\u2019UC1, hors taxes, hors droits de douanes. Le projet sera compl\u00e9t\u00e9 avec des activit\u00e9s financ\u00e9es \u00e0 travers les ressources<\/a><a> du Fond pour l\u2019environnement mondial (FEM) pour un montant estim\u00e9 \u00e0 8 millions $ USD.<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-zone-du-projet\"><a>Zone du projet<\/a><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<a>La ville de Yaound\u00e9 (Communaut\u00e9 urbaine et les sept communes d\u2019arrondissement).<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-cadre-d-actions-du-projet\"><a>Cadre d&rsquo;actions du projet<\/a><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<a>Les principales r\u00e9alisations attendues du projet couvrent trois principaux secteurs dont le d\u00e9veloppement des infrastructures et l&rsquo;appui institutionnel.<\/a><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><a>D\u00e9veloppement d\u2019infrastructures d\u2019assainissement et d\u2019am\u00e9lioration du cadre de vie<\/a><\/li>\n<\/ol>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Travaux d\u2019am\u00e9nagement d\u2019un bassin d\u2019\u00e9cr\u00eatement des crues (2ha) et d\u2019un Canal trap\u00e9zo\u00efdal (B=2 m, H = 1,5m) de 600 ml sur la rivi\u00e8re Djoungolo;<\/a><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Travaux de construction d\u2019un dalot (3&#215;2 m) de 40 ml situ\u00e9 en face de la voirie municipale (avenue Charles Atangana) raccordant le canal sur la rivi\u00e8re Mingoa sur la rivi\u00e8re Mfoundi;<\/a><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Travaux d\u2019\u00e9largissement des voies sur les berges le long des canaux construits sur la rivi\u00e8re Abiergue 1x 2 voies (860 ml) et raccordement sur Sapeur Mokolo ;<\/a><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Travaux de r\u00e9habilitation de la rue du Mfoundi (600 ml) entre carrefour SNI march\u00e9 du Mfoundi au Coll\u00e8ge Montesquieu ;<\/a><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Travaux d\u2019am\u00e9nagement d\u2019une place \u00e0 vivre sur les berges du canal sur l\u2019Ewou\u00e9 en face du march\u00e9\u0301 Mvog-Ada pour l\u2019am\u00e9lioration des conditions de vie des populations comprenant : des aires de sport (terrain de foot, terrain de basket et terrain de volley), un espace bois\u00e9 avec des voies de promenades pi\u00e9tonnes, un centre de promotion de la femme, un centre multifonctionnel de promotion des jeunes y compris un centre d\u2019\u00e9coute des enfants de la rue, des kiosques, du mobilier urbain, parkings, poste de police, toilettes, bacs \u00e0 ordures, \u00e9clairage public, etc.<\/a><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Curages des ouvrages et canaux au centre-ville,<\/a><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Curages des collecteurs principaux enterr\u00e9s Avenue Kennedy et du boulevard du 20 Mai.<\/a><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Travaux d\u2019am\u00e9nagement de la plateforme de pr\u00e9collecte des d\u00e9chets solides;<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Ma\u00eetrise d\u2019\u0153uvre (surveillance et contr\u00f4le) des travaux d\u2019infrastructures de <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Drainage des travaux de voirie et de construction de la place \u00e0 vivre; Les travaux de r\u00e9habilitation de la Rue du Mfoundi donnant acc\u00e8s au march\u00e9\u0301 du m\u00eame nom, d\u00e9grad\u00e9e lors des travaux de construction du canal ;<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">2. <a>Les appuis institutionnels<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a>Cette partie du projet comprend le renforcement des capacit\u00e9s de minist\u00e8res techniques, des<\/a><a> Communes de Yaound\u00e9 et autres intervenants dans la pr\u00e9collecte et la valorisation des d\u00e9chets. Les actions \u00e0 mener se d\u00e9composent de la mani\u00e8re suivante :<\/a><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Etudes de r\u00e9habilitation des ouvrages hydrauliques de capacit\u00e9\u0301 insuffisantes dans la ville de Yaound\u00e9<\/a><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Renforcement du parc d\u2019engins de la CUY<\/a><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Renforcement du parc d&rsquo;engins de chacune des 7 CAY<\/a><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Equipements d\u2019appui \u00e0 la pr\u00e9collecte des d\u00e9chets solides (bacs \u00e0 ordures)<\/a><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Mat\u00e9riel et \u00e9quipement en appui aux OSC (associations et ONG) de pr\u00e9collecte<\/a> <a>des d\u00e9chets et curage des drains (tricycle, brouettes, pelles, EPI, etc.)<\/a><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Services appui op\u00e9rationnalisation de la strat\u00e9gie de gestion des d\u00e9chets solides (Actions IEC\/ing\u00e9nierie et interm\u00e9diation sociale dans la structuration de la pr\u00e9collecte des d\u00e9chets m\u00e9nagers et le renforcement des capacit\u00e9s des organisations et structures intervenant dans la fili\u00e8re (appui sp\u00e9cifique aux organisations de femmes),<\/a><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Prestations de services communication\/visibilit\u00e9 (radio\/TV, spots, banderoles)<\/a><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Appui IRGM : mise en place d\u2019un syst\u00e8me de collecte et d\u2019analyse des donn\u00e9e<\/a>s <a>hydrom\u00e9t\u00e9orologiques<\/a><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Appui \u00e0 la mise en place d\u2019un syst\u00e8me d\u2019alerte pr\u00e9coce sur le changement climatique (mise en place d\u2019un syst\u00e8me de production des informations relatives \u00e0 la pr\u00e9vision des inondations ; \u00e9laboration et diffusion des bulletins de pr\u00e9visions climatiques saisonniers ; \u00e9laboration et diffusion des bilans climatiques aux \u00e9chelles mensuelles, trimestrielles et annuelles).<\/a><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Appuis institutionnels aux Directions techniques et directions sous tutelle de Minist\u00e8res techniques (MINEPAT, au MINHDU, au MINPROFF, au MINAS, au MINEPDED, au MINTRANSPORT)<\/a><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a>Etudes sur la valorisation et la gestion des d\u00e9chets solides dont celles du FEM<\/a><\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-solutions-techniques-retenues-et-solutions-de-substitution-etudiees\"><strong><a>Solutions techniques retenues et solutions de substitution <\/a>\u00e9tudi\u00e9es<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><a>1. Les solutions techniques retenues pour le projet d\u00e9coulent des diff\u00e9rentes \u00e9tudes d\u2019APD r\u00e9alis\u00e9es lors du PADY 2 et des le\u00e7ons apprises lors des phases pr\u00e9c\u00e9dentes. La construction de bassin d\u2019\u00e9cr\u00eatage des crues constitue une innovation importante apport\u00e9e \u00e0 cette phase pour l\u2019am\u00e9lioration de la gestion des \u00e9coulements en vue de la r\u00e9duction des inondations. Le dimensionnement des voies le long des berges des canaux tient compte de leur int\u00e9gration dans le trafic urbain et le raccordement aux voies existantes. Les voies le long du canal sur la Mingoa n&rsquo;ont pas \u00e9t\u00e9 retenues en raison de leur co\u00fbt \u00e9lev\u00e9 et leur faible int\u00e9gration dans le r\u00e9seau routier urbain. L\u2019am\u00e9nagement de ces voies devrait \u00eatre envisag\u00e9 ult\u00e9rieurement par la CUY en l\u2019int\u00e9grant dans un plan d\u2019am\u00e9nagement urbain des espaces libres le long de ce canal.<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a>2. Pour le volet hygi\u00e8ne et gestion des d\u00e9chets solides, les interventions visent essentiellement l\u2019op\u00e9rationnalisation de la strat\u00e9gie de gestion des d\u00e9chets solides dans la ville de Yaound\u00e9\u0301 dont l\u2019\u00e9tude a \u00e9t\u00e9 financ\u00e9 par l\u2019AFD lors du PADY2. Il est retenu le renforcement des capacit\u00e9s op\u00e9rationnelles et en \u00e9quipements techniques de la CUY et des 7 CAY pour la pr\u00e9collecte des d\u00e9chets solides et le curage des drains. Un appui sera apport\u00e9\u0301 aux associations et autres ONG actives dans la pr\u00e9collecte des d\u00e9chets solides, le curage des drains et la sensibilisation des populations. Un bureau d\u2019\u00e9tudes\/ ou une ONG sp\u00e9cialis\u00e9e sera recrut\u00e9\u0301 pour renforcer les capacit\u00e9s de ces organisations de terrain, assurer une interm\u00e9diation sociale entre les structures de pr\u00e9collecte, les CAY, la CUY et les entreprises en charge de la valorisation et la transformation des d\u00e9chets solides.<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a>3. Pour les infrastructures socio\u00e9conomiques, il est pr\u00e9vu l\u2019am\u00e9nagement d\u2019une place \u00e0 vivre sur les berges du canal construit sur la rivi\u00e8re Ewou\u00e9 au PADY2. Cette place \u00e0 vivre comportera des aires de sport (terrain de foot, basket et volley), un espace bois\u00e9 avec des voies pi\u00e9tonnes, une maison de la femme, une maison des jeunes, des kiosques, du mobilier urbain, parking, poste de police, toilette, bac \u00e0 ordures, \u00e9clairage, etc.). Un espace cl\u00f4tur\u00e9 et s\u00e9curis\u00e9 pour l\u2019\u00e9panouissement des femmes, des jeunes et de toute la population de la ville en particulier celle des quartiers densement peupl\u00e9es aux environs.<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contexte du projet Le projet compl\u00e9mentaire d\u2019assainissement pluvial durable de la Ville de Yaound\u00e9\u0301 (PCADY) s\u2019inscrit dans la continuit\u00e9\u0301 des objectifs vis\u00e9s par les phases 1 et 2 du Projet [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[142],"tags":[],"class_list":["post-2414","post","type-post","status-publish","format-standard","hentry","category-pcady"],"_links":{"self":[{"href":"https:\/\/yaounde.cm\/index.php?rest_route=\/wp\/v2\/posts\/2414","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yaounde.cm\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yaounde.cm\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yaounde.cm\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/yaounde.cm\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2414"}],"version-history":[{"count":2,"href":"https:\/\/yaounde.cm\/index.php?rest_route=\/wp\/v2\/posts\/2414\/revisions"}],"predecessor-version":[{"id":2418,"href":"https:\/\/yaounde.cm\/index.php?rest_route=\/wp\/v2\/posts\/2414\/revisions\/2418"}],"wp:attachment":[{"href":"https:\/\/yaounde.cm\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2414"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yaounde.cm\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2414"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yaounde.cm\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2414"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}